Reliability Standards Regulation, amendment, M.R. 34/2024

Règlement modifiant le Règlement sur les normes de fiabilité, R.M. 34/2024

The Manitoba Hydro Act, C.C.S.M. c. H190

Loi sur l'Hydro-Manitoba, c. H190 de la C.P.L.M.


Regulation  34/2024
Registered May 3, 2024

bilingual version (HTML)

Règlement  34/2024
Date d'enregistrement : le 3 mai 2024

version bilingue (HTML)
Manitoba Regulation 25/2012 amended

1   The Reliability Standards Regulation, Manitoba Regulation 25/2012, is amended by this regulation.

Modification du R.M. 25/2012

1   Le présent règlement modifie le Règlement sur les normes de fiabilité, R.M. 25/2012.

2   Schedule 1 is replaced with Schedule 1 to this regulation.

2   L'annexe 1 est remplacée par l'annexe 1 du présent règlement.

Coming into force

3   This regulation comes into force on July 1, 2024.

Entrée en vigueur

3   Le présent règlement entre en vigueur le 1er juillet 2024.


SCHEDULE 1

(Section 2)

RELIABILITY STANDARDS

Standard Number Standard Name Effective Date
BAL-001-2 Real Power Balancing Control Performance July 1, 2017
BAL-002-3 Disturbance Control Standard — Contingency Reserve for Recovery from a Balancing Contingency Event January 1, 2021
BAL-003-2 Frequency Response and Frequency Bias Setting July 1, 2021
BAL-005-1 Balancing Authority Control January 1, 2021
CIP-002-5.1a Cyber Security — BES Cyber System Categorization July 1, 2018
CIP-003-8 Cyber Security — Security Management Controls July 1, 2021
CIP-004-6 Cyber Security — Personnel & Training July 1, 2017
CIP-005-7 Cyber Security — Electronic Security Perimeter(s) July 1, 2023
CIP-006-6 Cyber Security — Physical Security of BES Cyber Systems July 1, 2017
CIP-007-6 Cyber Security — System Security Management July 1, 2017
CIP-008-6 Cyber Security — Incident Reporting and Response Planning July 1, 2022
CIP-009-6 Cyber Security — Recovery Plans for BES Cyber Systems July 1, 2017
CIP-010-4 Cyber Security — Configuration Change Management and Vulnerability Assessments July 1, 2023
CIP-011-2 Cyber Security — Information Protection July 1, 2017
CIP-012-1 Cyber Security — Communications between Control Centers July 1, 2023
CIP-013-2 Cyber Security — Supply Chain Risk Management July 1, 2023
CIP-014-3 Physical Security July 1, 2023
COM-001-3 Communications July 1, 2019
COM-002-4 Operating Personnel Communications Protocols July 1, 2017
EOP-004-4 Event Reporting January 1, 2021
EOP-005-3 System Restoration from Blackstart Resources January 1, 2021
EOP-006-3 System Restoration Coordination January 1, 2021
EOP-008-2 Loss of Control Center Functionality January 1, 2021
EOP-010-1 Geomagnetic Disturbance Operations July 1, 2016
EOP-011-2 Emergency Preparedness and Operations July 1, 2024
FAC-001-3 Facility Interconnection Requirements January 1, 2021
FAC-002-3 Facility Interconnection Studies July 1, 2022
FAC-003-4 Transmission Vegetation Management July 1, 2017
FAC-008-5
(Excl. R4, R5, R7)
Facility Ratings July 1, 2022
FAC-010-3
(Excl. R5)
System Operating Limits Methodology for the Planning Horizon July 1, 2018
FAC-011-3 System Operating Limits Methodology for the Operations Horizon July 1, 2018
FAC-014-2 Establish and Communicate System Operating Limits April 1, 2012
INT-006-5
(Excl. R4, R5)
Evaluation of Interchange Transactions July 1, 2022
INT-009-3
(Excl. R2)
Implementation of Interchange July 1, 2022
IRO-001-4 Reliability Coordination — Responsibilities July 1, 2017
IRO-002-7
(Excl. R1)
Reliability Coordination — Monitoring and Analysis July 1, 2022
IRO-006-5 Reliability Coordination — Transmission Loading Relief (TLR) April 1, 2012
IRO-006-EAST-2 Transmission Loading Relief Procedure for the Eastern Interconnection July 1, 2017
IRO-008-2 Reliability Coordinator Operational Analyses and Real-time Assessments July 1, 2017
IRO-009-2 Reliability Coordinator Actions to Operate Within IROLs July 1, 2017
IRO-010-4 Reliability Coordinator Data Specification and Collection July 1, 2024
IRO-014-3 Coordination Among Reliability Coordinators July 1, 2017
IRO-017-1 Outage Coordination July 1, 2017
IRO-018-1(i) Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities July 1, 2019
MOD-025-2 Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability January 1, 2021
MOD-031-3 Demand and Energy Data July 1, 2022
MOD-032-1 Data for Power System Modeling and Analysis July 1, 2016
MOD-033-2 Steady-State and Dynamic System Model Validation July 1, 2022
PER-003-2 Operating Personnel Credentials January 1, 2021
PER-005-2 Operations Personnel Training July 1, 2017
PER-006-1 Specific Training for Personnel July 1, 2022
PRC-002-2 Disturbance Monitoring and Reporting Requirements July 1, 2023
PRC-004-6
(Excl. R4)
Protection System Misoperation Identification and Correction July 1, 2022
PRC-005-1.1b Transmission and Generation Protection System Maintenance and Testing July 1, 2016
PRC-006-5 Automatic Underfrequency Load Shedding July 1, 2022
PRC-008-0 Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program April 1, 2012
PRC-010-2 Undervoltage Load Shedding July 1, 2018
PRC-011-0 Undervoltage Load Shedding System Maintenance and Testing April 1, 2012
PRC-012-2 Remedial Action Schemes January 1, 2021
PRC-017-1 Remedial Action Scheme Maintenance and Testing July 1, 2018
PRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection January 1, 2021
PRC-023-4 Transmission Relay Loadability July 1, 2018
PRC-024-3 Frequency and Voltage Protection Settings for Generating Resources July 1, 2023
PRC-026-1 Relay Performance During Stable Power Swings July 1, 2021
PRC-027-1 Coordination of Protection Systems for Performance During Faults July 1, 2022
TOP-001-5
(Excl. R19, R22)
Transmission Operations July 1, 2022
TOP-002-4 Operations Planning July 1, 2017
TOP-003-5 Operational Reliability Data July 1, 2024
TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities July 1, 2019
VAR-001-5 Voltage and Reactive Control January 1, 2021
VAR-002-4.1 Generator Operation for Maintaining Network Voltage Schedules July 1, 2019

ANNEXE 1

(article 2)

NORMES DE FIABILITÉ

Numéro de la norme Titre de la norme Date d'entrée en vigueur
BAL-001-2 Real Power Balancing Control Performance 1er juillet 2017
BAL-002-3 Disturbance Control Standard — Contingency Reserve for Recovery from a Balancing Contingency Event 1er janvier 2021
BAL-003-2 Frequency Response and Frequency Bias Setting 1er juillet 2021
BAL-005-1 Balancing Authority Control 1er janvier 2021
CIP-002-5.1a Cyber Security — BES Cyber System Categorization 1er juillet 2018
CIP-003-8 Cyber Security — Security Management Controls 1er juillet 2021
CIP-004-6 Cyber Security — Personnel & Training 1er juillet 2017
CIP-005-7 Cyber Security — Electronic Security Perimeter(s) 1er juillet 2023
CIP-006-6 Cyber Security — Physical Security of BES Cyber Systems 1er juillet 2017
CIP-007-6 Cyber Security — System Security Management 1er juillet 2017
CIP-008-6 Cyber Security — Incident Reporting and Response Planning 1er juillet 2022
CIP-009-6 Cyber Security — Recovery Plans for BES Cyber Systems 1er juillet 2017
CIP-010-4 Cyber Security — Configuration Change Management and Vulnerability Assessments 1er juillet 2023
CIP-011-2 Cyber Security — Information Protection 1er juillet 2017
CIP-012-1 Cyber Security — Communications between Control Centers 1er juillet 2023
CIP-013-2 Cyber Security — Supply Chain Risk Management 1er juillet 2023
CIP-014-3 Physical Security 1er juillet 2023
COM-001-3 Communications 1er juillet 2019
COM-002-4 Operating Personnel Communications Protocols 1er juillet 2017
EOP-004-4 Event Reporting 1er janvier 2021
EOP-005-3 System Restoration from Blackstart Resources 1er janvier 2021
EOP-006-3 System Restoration Coordination 1er janvier 2021
EOP-008-2 Loss of Control Center Functionality 1er janvier 2021
EOP-010-1 Geomagnetic Disturbance Operations 1er juillet 2016
EOP-011-2 Emergency Preparedness and Operations 1er juillet 2024
FAC-001-3 Facility Interconnection Requirements 1er janvier 2021
FAC-002–3 Facility Interconnection Studies 1er juillet 2022
FAC-003-4 Transmission Vegetation Management 1er juillet 2017
FAC-008-5
(sauf R4, R5, R7)
Facility Ratings 1er juillet 2022
FAC-010-3
(sauf R5)
System Operating Limits Methodology for the Planning Horizon 1er juillet 2018
FAC-011-3 System Operating Limits Methodology for the Operations Horizon 1er juillet 2018
FAC-014-2 Establish and Communicate System Operating Limits 1er avril 2012
INT-006-5
(sauf R4, R5)
Evaluation of Interchange Transactions 1er juillet 2022
INT-009-3
(sauf R2)
Implementation of Interchange 1er juillet 2022
IRO-001-4 Reliability Coordination — Responsibilities 1er juillet 2017
IRO-002-7
(sauf R1)
Reliability Coordination — Monitoring and Analysis 1er juillet 2022
IRO-006-5 Reliability Coordination — Transmission Loading Relief (TLR) 1er avril 2012
IRO-006-EAST-2 Transmission Loading Relief Procedure for the Eastern Interconnection 1er juillet 2017
IRO-008-2 Reliability Coordinator Operational Analyses and Real-time Assessments 1er juillet 2017
IRO-009-2 Reliability Coordinator Actions to Operate Within IROLs 1er juillet 2017
IRO-010-4 Reliability Coordinator Data Specification and Collection 1er juillet 2024
IRO-014-3 Coordination Among Reliability Coordinators 1er juillet 2017
IRO-017-1 Outage Coordination 1er juillet 2017
IRO-018-1(i) Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities 1er juillet 2019
MOD-025-2 Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 1er janvier 2021
MOD-031-3 Demand and Energy Data 1er juillet 2022
MOD-032-1 Data for Power System Modeling and Analysis 1er juillet 2016
MOD-033-2 Steady-State and Dynamic System Model Validation 1er juillet 2022
PER-003-2 Operating Personnel Credentials 1er janvier 2021
PER-005-2 Operations Personnel Training 1er juillet 2017
PER-006-1 Specific Training for Personnel 1er juillet 2022
PRC-002-2 Disturbance Monitoring and Reporting Requirements 1er juillet 2023
PRC-004-6
(sauf R4)
Protection System Misoperation Identification and Correction 1er juillet 2022
PRC-005-1.1b Transmission and Generation Protection System Maintenance and Testing 1er juillet 2016
PRC-006-5 Automatic Underfrequency Load Shedding 1er juillet 2022
PRC-008-0 Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program 1er avril 2012
PRC-010-2 Undervoltage Load Shedding 1er juillet 2018
PRC-011-0 Undervoltage Load Shedding System Maintenance and Testing 1er avril 2012
PRC-012-2 Remedial Action Schemes 1er janvier 2021
PRC-017-1 Remedial Action Scheme Maintenance and Testing 1er juillet 2018
PRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 1er janvier 2021
PRC-023-4 Transmission Relay Loadability 1er juillet 2018
PRC-024-3 Frequency and Voltage Protection Settings for Generating Resources 1er juillet 2023
PRC-026-1 Relay Performance During Stable Power Swings 1er juillet 2021
PRC-027-1 Coordination of Protection Systems for Performance During Faults 1er juillet 2022
TOP-001-5
(sauf R19, R22)
Transmission Operations 1er juillet 2022
TOP-002-4 Operations Planning 1er juillet 2017
TOP-003-5 Operational Reliability Data 1er juillet 2024
TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities 1er juillet 2019
VAR-001-5 Voltage and Reactive Control 1er janvier 2021
VAR-002-4.1 Generator Operation for Maintaining Network Voltage Schedules 1er juillet 2019